Building Permits
Building Permits are required for new constructions, additions, alterations, and demolition/removal of a building or structure.
About Building Permits
Building plans shall be filed and approved by the Department (as a Building Plan Check) before any permit is issued for the following:
- New building or structure
- Addition to building
- Structural alteration to building or structure
- Interior modification and change of floor plan
- Change of use and/or occupancy
- Parking layout change
- Use-of-land, such as recycling deposit center, open air storage, outdoor temporary events
- Signs and sign structures
- Fences, retaining walls and shoring plans
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Methane Hazard Mitigation Standard Plan Simplified Method for Small Additions
IB/P/BC 2014-102
- Effective
Use of Sump Pumps for Surface and Subsurface Drainage
IB/P/BC 2017-103
- Effective
Use of Sump Pumps for Surface and Subsurface Drainage
IB/P/BC 2020-103
- Effective
Guardrail Requirements Adjacent to Openable Windows
IB/P/BC 2017-105
- Effective
Guardrail Requirements Adjacent to Openable Windows
IB/P/BC 2020-105
- Effective
Water Curtain in Lieu of Protected Exterior Openings
IB/P/BC 2023-106
- Effective
Guidelines for Vehicle Sales Use of Land Permit
IB/P/BC 2020-107
- Effective
Certificates of Completion Versus Certificates of Occupancy for Condominium Conversions and Other Alterations to Apartment Buildings
IB/P/BC 2023-108
- Effective
Filtered categories:
Filtered categories:
Interconnection Ties for Individual Pile Caps and Caissons
IB/P/BC 2020-030
- Effective
Interest List for Methane Mitigation Designers-Test Labs-Equipment Suppliers
Interim General Policy for Plan Check Time Extension
IB/P/BC 2020-120
- Effective
Interim General Policy for Plan Check Time Extension
IB/P/BC 2017-120
- Effective
Filtered categories: