Building Permits
Building Permits are required for new constructions, additions, alterations, and demolition/removal of a building or structure.
About Building Permits
Building plans shall be filed and approved by the Department (as a Building Plan Check) before any permit is issued for the following:
- New building or structure
- Addition to building
- Structural alteration to building or structure
- Interior modification and change of floor plan
- Change of use and/or occupancy
- Parking layout change
- Use-of-land, such as recycling deposit center, open air storage, outdoor temporary events
- Signs and sign structures
- Fences, retaining walls and shoring plans
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Single Family Dwelling/Duplex Plan Check Correction Sheets (2020 LARC)
PC/STR/Corr.Lst.020-2020
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Plan Check Correction Sheet for Structural Design - General (2017 LABC)
PC/STR/Corr.Lst.104-2017
Signs-General Plan Check Correction Sheets (2017 LABC)
PC/STR/Corr.Lst.059-2017
Model Water Efficiency Landscape Ordinance (MWELO) Project Correction Sheet
PC/GRN/Corr.Lst.05-2017
- Effective
Newly Constructed Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.04-2017
- Effective
Additions and Alterations Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.01-2017
- Effective
Newly Constructed Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.02-2017
- Effective
Additions and Alterations Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.03-2017
- Effective
Filtered categories:
What are the pressure and flow requirements at the standpipe hose valves?
What are the requirements for fire protection in a high-rise retrofit building?
Filtered categories:
Early Start Permit (Foundation Only) (for 2011 Codes)
PC/STR/Mod52-2013
Early Start Permit (Interior Demolition Without Triggering Disabled Access Upgrade)
PC/STR/Mod053-2020
Early Start Permit (Interior Demolition Without Triggering Disabled Access Upgrade) (for 2011 Codes)
PC/STR/Mod53-2013
Filtered categories:
What are the pressure and flow requirements at the standpipe hose valves?
What are the requirements for fire protection in a high-rise retrofit building?