Mechanical Test Lab (MTL)
The Mechanical Test Lab is responsible for reviewing applications for mechanical product approvals through its Research Section and Mechanical Test Lab. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
MTL
Test Lab Engineer: Cristina Acevedo-Leija
Email: Cristina.Acevedo-Leija@lacity.org
Telephone: (213) 202-9902
Additional Resources
- FAQ
- Applications
- Publications & Rosters
FAQ Search Results
Filtered categories:
All
Please see Section 91. 7006.5.7 of the Los Angeles Municipal Code (L.A.M.C.)
Was this helpful?
After the permit fee is paid, an LADBS Plan Check Engineer will stamp your plans and you will be able to download the stamped plans from your dashboard.
Was this helpful?
Check the “Search Online Building Records” on the Department’s website. Previous soils/geology reports can also be obtained at the Records Section locations at 201 N. Figueroa Street, Rm. 110 (Metro) or 6262 Van Nuys Blvd., 2nd Floor (Van Nuys).
Was this helpful?
You may view our employee directory on the LADBS website to look up your plan checker contact information.
Was this helpful?
For small to medium projects, you may visit the Metro (Downtown), Van Nuys, and West LA offices on a walk-in basis for a Counter Plan Check. Your plans are reviewed same day, in about 45-60 minutes
For large, complex projects, plans are sent in for a Regular Plan Check and reviewed within weeks.
For major developer projects, the design and permit process are allowed concurrently, in the Parallel Design - Permitting Process.
Was this helpful?
You can visit our Pre-Approved Standard Plans page for more information.
Was this helpful?
All new buildings or additions, and any alteration with valuation of more than $200,000.0 need to comply with the LA City Green code.
Was this helpful?
Make sure that the equipment approval has not expired by checking the equipment approval letter. Each letter has an approval and expiration date that is indicated on the top right hand of the letter.
Was this helpful?
You can check with the office where you submitted your Demo Pre-Inspection (DPI) application for the status. You will be called once the GPI is ready.
Was this helpful?
You can check with the office at which you submitted your Grading Pre-Inspection (GPI) application for the status. You will be called once the GPI is ready.
Was this helpful?
Filtered categories:
Filtered categories: