Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Engineer: Antonio Maldonado
Email: antonio.maldonado@lacity.org Telephone: (213) 482-7382
Engineer: Isaac Almaraz
Email: isaac.almaraz@lacity.org Telephone: (213) 482-0035
Engineer: Stephanie Lopez
Email: stephanie.j.lopez@lacity.org Telephone: (213) 482-0068
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
For General Approval – City of Los Angeles only:
Testing must be witnessed by an independent third party Testing Agency approved by the Los Angeles City, Department of Building and Safety (LADBS). The Approved Testing Agency shall issue the test report. The Approved Testing Agency shall approve the testing facility where the testing occurs to meet the requirements as specified in Information Bulletin P/GI 2014-028, Rules and Regulations for Recognition of Testing Agencies.
For Research Reports based on an Evaluation Report from a nationally recognized model code agency:
Test reports shall come from a qualified testing agency approved by the Model Code Agency issuing the Evaluation Report. The approved testing agency shall take necessary steps to ensure that the integrity and condition of the test specimens are maintained and are not altered during periods when a laboratory representative is not present. Also, the manufacturer’s testing facility shall show to the satisfaction of the approved testing agency that it meets the requirements for an approved testing agency.
Was this helpful?
No. These pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
No. These pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
Please contact the individual jurisdiction to inquire whether they will accept a City of Los Angeles Pre-Approved Standard Plan.
Was this helpful?
Please contact the individual jurisdiction to inquire whether they will accept a City of Los Angeles Pre-Approved Standard Plan.
Was this helpful?
No, these pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
No, these pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
To be considered an eligible project in accordance to Emergency Executive Order 1, the rebuilt structure shall not exceed 110% of the height that existed immediately before the Wildfires:
- If the grade for the rebuild is the same as it existed immediately before the Wildfires, the height of the rebuilt structure shall not exceed 110% of the original height. The original height is the height of the structure that existed immediately prior to the fire.
- If the rebuilt grade is raised, the structure's rebuild height shall not exceed 110% of the original height minus the amount the grade was raised. For example, if the grade was raised by 5’ and the original structure height was 30’, the new allowable height will be 33 ft minus 5 ft resulting in a 28’ maximum height from the new raised grade.
- If the rebuilt grade is lowered, the new rebuild height shall not exceed 110% of the original structure height measured from the lowered grade. For example, if the grade was lowered by 5’ and the original structure height was 30’, the new allowable height will be 33’ from the new lowered grade.
- The original grade, which existed immediately before the wildfire, shall be certified by a licensed surveyor or civil engineer.
Was this helpful?
Only products that have either a Laboratory or General Approval (no one-time approvals) may be subject to annual renewal. About 60 days before an approval expires, the original applicant needs to take the following actions:
- Submit a completed renewal application form (PC-ELEC-App.12). Original signature is required.
- Submit the application fee as marked on the application form. Make check payable to “The Department of Building and Safety, City of Los Angeles.”
- Submit a current production sample of the equipment along with an explanation if there were any changes to the equipment from the previous approval.
Was this helpful?
Submit an “Application for Testing or Evaluating Mechanical Equipment” (found on the "Mechanical Test Lab (MTL)" page) to LADBS-MTL, check the box “renewal” and pay the fees.
Additional information, tests, and/or engineering analysis may be required, in which case written comments will be sent to the applicant.
Was this helpful?
Filtered categories:
Filtered categories: