Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
An AQMD clearance is required for charbroilers spray booth, dry cleaning, motor fuel storage, ETC.
Was this helpful?
Projects that utilizes higher stresses require the Architect or Engineer to submit the form.
Was this helpful?
When work performed and materials used are required to comply with Title 24 Energy Regulations.
Was this helpful?
When all framing has been approved.
Was this helpful?
Permits are issued for many different types of work, including Building, Electrical and Plumbing just to name a few. Please visit each our Plan Review & Permit page for more information about when a permit is required.
If you have a specific question on whether the work you are performing requires a permit, please feel free to call 3-1-1 for further assistance.
Was this helpful?
A plumbing permit is required for the installation of any gas piping, except piping less than 6 feet in length between an existing gas outlet and a gas appliance in the same room.
Was this helpful?
When clearance for the plumbing is required.
Was this helpful?
A reroof certificate is required for existing building in which the roof is replaced or repaired.
Was this helpful?
When all rough sheathing is in place and nailed.
Was this helpful?
When all framing is in place and electrical and plumbing installed.
Was this helpful?
Filtered categories:
Filtered categories: