Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
The Zoning Code Manual and Commentary PDF is an interpretation of the Zoning code. It is a useful tool to answer more specific questions regarding Zoning.
Was this helpful?
- To obtain a building permit, you will need to provide a completed Building Permit Application, a copy of the LA City approved stamped ADU Standard Plan, and plans indicating how the Standard Plan will be adapted to a specific site. This should include the necessary details indicating how and where the structure will be built in a specific location (i.e. plot plan showing setbacks, etc.).
- All applications and plans must then be submitted at one of our offices or uploaded/submitted via Eplan. No structural calculations are required. The Department will review all of the plans and issue a building permit once it is verified site-specific factors for the property, including compliance with the Zoning Code and foundation requirements.
Was this helpful?
For a complete listing of building permit submittal requirements, please refer to the Building Permit Checklist.
Was this helpful?
- To obtain a building permit, you will need to provide a complete Building Permit application, a copy of the LA City approved stamped Standard Plan, and plans indicating how the Standard Plan will be adapted to a specific site. This should include the necessary details indicating how and where the structure will be built in a specific location (i.e. plot plan showing setbacks, etc.).
- All applications and plans must then be submitted at one of our offices or uploaded/submitted via Eplan. No structural calculations are required. The Department will review all of the plans and issue a building permit once it is verified that site-specific factors for the property, including compliance with foundation requirements are met.
- For a complete listing of building permit submittal requirements, please refer to the Standard Plan - Building Permit Submittal Checklist.
Was this helpful?
Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches. Project into the side yard adjoining the street lot line of a corner lot not more than 30 inches, provided the width is not reduced to less than 30 inches.
Open roof and unenclosed trellis
Open, unenclosed stairways or balconies not covered by a roof or canopy: Project into a required rear yard not more than 4 feet. Project into a required front yard 30 inches. Project into the side yard adjoining a street lot line of a corner lot, not more than 30 inches, provided the width is not reduced to less than 30 inches.
Open, unenclosed porches, platforms, or landing places (including access stairways) not covered by a roof or canopy which does not extend above the level of the first floor of the building, provided: Projection is maximum 6 feet into the required front, side, and rear yards Projection is maximum 6 feet above adjacent grade.
Chimney: Project into the required front, side, and rear yards not more than 2 feet. The width of the required side yard shall not be reduced to less than 3 feet.
A bay window or garden type window of normal size may project 8 inches into a required side yard, provided the width of the required side yard is not reduced to less than 3 feet.
Tankless water heaters may project 18 inches into the required side yard, provided such side yard is not reduced to less than 3 feet in width.
The following roof structures are allowed to project above the like-for-like height limit:
Stairway housing (no larger than 72 square feet) may project 5 feet.
Elevator housing may project 5 feet, provided it is setback a minimum of 5 feet from the roof perimeter.
Chimneys may project 5 feet.
Was this helpful?
The proposed conversion will be subject to all zoning code and fire sprinkler regulations in place at the time of the proposed change of use. If the ADU or JADU was constructed within an existing building, non-conforming rights from the building and use that existed prior to the ADU or JADU may be considered at the discretion of LADBS.
Was this helpful?
Public Record Act Requests to the Department of Building and Safety (LADBS) may include a wide variety of Departmental documents and materials (including print, photographic, and electronic formats) that were created or obtained by the department and are, at the time the request is filed, in the department's care and custody. The Public Records Act excludes certain categories of records from disclosure.
Please be advised that some LADBS documents are available in electronic format and can be obtained online from the Departments Official Document Repository, the LADBS Internet Document Imaging System (IDIS) here:
Search Online Building Records
Other documents that are not available online, but are indexed in IDIS can be obtained through the LADBS Public Records Counter by submitting a Research Request Form available here:
Forms and Publications - Service Requests
Copies of Building Plans (Blueprints) are also obtained through the LADBS Public Records Counter by submitting a Research Request Form.
Was this helpful?
The BBSC is granted the authority by the Code and by the City Charter, to hear many kinds of appeals, including but not limited to the following:
- Appeals of the Department’s action regarding requests for slight modifications of the Building Ordinances and/or Code Violation Inspection Fee Ordinances, pursuant to the authority described in LAMC Section 98.0403.1(b) 1.
- Appeals from determinations, orders or actions of the Department pertaining to enforcement of specific ordinances, regulations or laws in individual cases, pursuant to LAMC Section 98.0403.1(b) 2 (i.e. error and abuse, except land use issues)
- Applications for import/export of soil pursuant to LAMC Section 91.7006.7.4.
- "Quasi-Judicial" proceedings pursuant to Division 89 of the LAMC (NOID, PNH)
- Adoption of Building, Electrical, Mechanical, Plumbing, HVAC, etc Ordinances
- The BBSC does not hear cases related to land use ordinances. These cases shall be heard by the Department of City Planning in accordance with Section 12.26K of the Los Angeles Municipal Code.
- Read more about the BBSC appeals process.
Was this helpful?
Automobile parking is not required for ADUs created within an existing or proposed main home or an existing accessory structure. ADU parking may be required if the ADU exceeds the existing square footage of an existing main home (primary residence) or accessory structure, as well as for a newly constructed detached ADU. Other parking waivers in LAMC Section 12.22 A.33(c)(12)(i) may also apply.
Was this helpful?
Since June 9, 2025, LADBS has been accepting applications for architects using the process shown in the Implementation Guidelines.
For civil engineers, LADBS will begin accepting applications February 17, 2026.