Mechanical HVAC Inspection
Provides inspection services for all commercial and industrial buildings, and verifies compliance with the Mechanical code.
About Inspection
LADBS is responsible for inspections of all Heating, Ventilation, Air Conditioning, Refrigeration and Fire Life Safety Testing for Mechanical systems, including stairwell pressurization and smoke control smoke evacuation systems installed in all commercial, mixed use and multifamily buildings.
Additional Resources
- Code Amendment
- Forms & Applications
- Request for Modification
Filtered categories:
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Pump Systems (Domestic or Fire) (2017 LAPC & 2016 NFPA-20)
PC/MECH/Corr.Lst.30-2017
Supplemental Correction Sheets for Pump Systems (Domestic or Fire)
PC/MECH/Corr.Lst.30-2020
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps (for 2017 Codes)
PC/MECH/Corr.Lst.31-2017
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps
PC/MECH/Corr.Lst.31-2020
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Plan Check Correction Sheet for Mechanical Systems
PC/MECH/Corr.Lst.58-2023
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Filtered categories:
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2023-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective