Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Single Family Dwelling/Duplex Plan Check Correction Sheets (2020 LARC)
PC/STR/Corr.Lst.020-2020
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Plan Check Correction Sheet for Structural Design - General (2017 LABC)
PC/STR/Corr.Lst.104-2017
Signs-General Plan Check Correction Sheets (2017 LABC)
PC/STR/Corr.Lst.059-2017
Model Water Efficiency Landscape Ordinance (MWELO) Project Correction Sheet
PC/GRN/Corr.Lst.05-2017
- Effective
Newly Constructed Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.04-2017
- Effective
Additions and Alterations Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.01-2017
- Effective
Newly Constructed Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.02-2017
- Effective
Additions and Alterations Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.03-2017
- Effective
Filtered categories:
Single Family Dwelling/Duplex Plan Check Correction Sheets (2020 LARC)
PC/STR/Corr.Lst.020-2020
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Plan Check Correction Sheet for Structural Design - General (2017 LABC)
PC/STR/Corr.Lst.104-2017
Signs-General Plan Check Correction Sheets (2017 LABC)
PC/STR/Corr.Lst.059-2017
Model Water Efficiency Landscape Ordinance (MWELO) Project Correction Sheet
PC/GRN/Corr.Lst.05-2017
- Effective
Newly Constructed Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.04-2017
- Effective
Additions and Alterations Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.01-2017
- Effective
Newly Constructed Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.02-2017
- Effective
Additions and Alterations Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.03-2017
- Effective
Filtered categories:
What are the pressure and flow requirements at the standpipe hose valves?
What are the requirements for fire protection in a high-rise retrofit building?