Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Maintenance of Building (Graffiti Removal) (for 2011 Codes)
PC/STR/Aff42-2009
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Affidavit of Impact Hazard Glazing (for 2011 Codes)
PC/STR/Aff19-2009
Covenant and Agreement for Community Driveway Over Two or More Parcels (for 2011 Codes)
PC/STR/Aff.13B-2015
Maintenance of Building (Vehicle Life System - 2 Levels) (for 2011 Codes)
PC/STR/Aff43-2012
Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards Geological Nature (for 2011 Codes)
PC/STR/Aff21-2009
Covenant and Agreement Regarding Maintenance of Building (for 2011 Codes)
PC/STR/Aff.32-2010
Filtered categories:
Maintenance of Building (Graffiti Removal) (for 2011 Codes)
PC/STR/Aff42-2009
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Affidavit of Impact Hazard Glazing (for 2011 Codes)
PC/STR/Aff19-2009
Covenant and Agreement for Community Driveway Over Two or More Parcels (for 2011 Codes)
PC/STR/Aff.13B-2015
Maintenance of Building (Vehicle Life System - 2 Levels) (for 2011 Codes)
PC/STR/Aff43-2012
Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards Geological Nature (for 2011 Codes)
PC/STR/Aff21-2009
Covenant and Agreement Regarding Maintenance of Building (for 2011 Codes)
PC/STR/Aff.32-2010
Filtered categories:
How do I know when my project needs to comply with Disabled Access requirements?
How do I know when my project needs to comply with Energy requirements?