Skip to main content
Sump Pump for Site Drainage
PC/GRAD/Mod20-2017
       
Stockpiling of Dirt
PC/GRAD/Mod19-2017
       
Use a Scale per Foot Smaller than 0.125 Inch for Site Utility Drawing
PC/ELEC/Mod16-2017
       
MC Cable Only Permit
PC/ELEC/Mod59-2017
       
Installation of Equipment Prior to Test Lab Approval
PC/ELEC/Mod13-2017
       
Extend Plan Check Time
PC/ELEC/Mod10-2017
       
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
       
Conduit Only Permit (Early Start Permit)
PC/ELEC/Mod54-2017
       
Add Loads to an Existing Installation
PC/ELEC/Mod07-2017
       
Separate Fire Alarm Plans
PC/ELEC/Mod15-2017
       
Separate Approval for Fire Life Safety Plans
PC/ELEC/Mod41-2017
       
Alternative Construction Materials
PC/STR/Mod104-2020
       
Epoxy Injection of Cracks
PC/STR/Mod39-2020
       
Expiration of Building Permit
PC/STR/Mod40-2020
       
Extension of Time for Plan Check
PC/STR/Mod41-2019
       
Extension of Time for Plan Check - Current Code
PC/STR/Mod41A-2020
       
Extension of Time to Start Construction
PC/STR/Mod42-2020
       
Temporary Sign Permit Bond Instructions
       
Temporary Sign Permit Cash Bond Form
PC/STR/Bond.001
       
Temporary Sign Permit Surety Bond Form
PC/STR/Bond.02