Skip to main content
Will I schedule the Fire Department before the Building inspector for a special event?

The Temporary Special Event (TSE) permit must be obtained then contact the Fire Department.

    Read FAQ
Will LADBS accept copies of the required forms?

Original documents are required. Copies may be accepted under special circumstances.

    Read FAQ
Will the Certificate of Occupancy be mailed to me?

Yes, the clerical staff will mail it out once the inspector issues and turn it in for filing.

    Read FAQ
Will the inspector be at the site during the special events?

No, but there may be a fire inspector present.

    Read FAQ
Does my mechanical product need to be on the LA Research Report Database in order to be acceptable?

No, the product is acceptable if it is listed by a City of Los Angeles recognized listing agency.

    Read FAQ
How can I obtain a general approval from the Mechanical Test Lab?

The product manufacturer needs to file a test lab application and submit the required testing reports. Please visit the Mechanical Test Lab page for applications.

    Read FAQ
How can I obtain approval as a mechanical listing/testing agency?

You will need to file an application with the Mechanical Testing Laboratory.

    Read FAQ
How can I obtain approval from the Mechanical Test Lab if there are currently no published applicable testing standards?

Approval from LA City Mechanical Testing Laboratory cannot be obtained for products that do not have applicable testing standards.

    Read FAQ
How long will it take for my application to be processed?

The process time depends on the current backlog and type of application submitted. Contact the Mechanical Test Lab Engineer for more information.

    Read FAQ
What product standard(s) do I need to have my product tested by an approved testing agency?

A product (or equipment) is considered approved if it bears either the approval label of the City of Los Angeles Electrical Test Lab, or listing or certification label, symbol or other identifying mark of a recognized testing agency.

    Read FAQ
Where can I find a roster of the approved listing and testing agencies recognized by the Mechanical Test Lab?

Approved testing and listing agencies are available from the Mechanical Test Lab page.

    Read FAQ
Where can I find the application for renewal, new general approval, technical modifications, and one-time approval from the Mechanical Test Lab?

All testlab applications are listed on the Mechanical Test Lab page on the LADBS website.

    Read FAQ
Are there exceptions to the requirement of "graywater ready" systems?

Yes. Graywater Ready Systems are not required when the landscape area on the site does not exceed 500 square feet, or when graywater irrigation is not permitted due to geological conditions, or for additions or alterations that use the existing building drain.

    Read FAQ
Can I combine emergency drains with subsoil drainage system?

Yes. However, the emergency drains shall be protected against backflow with backwater valves.

    Read FAQ
Can I discharge water from the sprinkler piping to the storm drain system?

No, water from sprinkler drain shall discharge to the sewer.

    Read FAQ
Can I get plan check approval before getting the gas service letter from the gas company?

No. Low pressure gas systems (2 psi or less) with more than 10 gas outlets require plan check. Medium and high pressure gas systems (more than 2 psi) require plan check regardless of the number of gas outlets.

    Read FAQ
Can I install a water heater in the yard?

The Plumbing Code allows outdoor installations of water heaters. Check with the Zoning engineer for required minimum distance from the property line.

    Read FAQ
Can I use a slope of less than 1% for rain water piping?

No, since the pipe sizing tables for rain rainwater are based on a minimum 1% slope.

    Read FAQ
Can I use ABS pipe in a residential building?

Plastic waste and vent piping in residential occupancies are allowed when the residential portion of the building is 2 stories or less.

    Read FAQ
What are the over-the-counter hours for Mechanical Plan Check?
  • Monday 7:30 AM - 4:30 PM
  • Tuesday 7:30 AM - 4:30 PM
  • Wednesday 9:00 AM - 4:30 PM
  • Thursday 7:30 AM - 4:30 PM
  • Friday 7:30 AM - 4:30 PM
  • Monday 7:30 AM - 4:30 PM
  • Tuesday 7:30 AM - 4:30 PM
  • Wednesday 9:00
    Read FAQ