Skip to main content

Guidelines for Permitting New Antennas and Replacement of Units on Existing Telecommunication Antennas (Cell Towers)

Submitted by fsepulveda on May 24, 2024
Effective field
Identifier
IB/P/BC 2020-146
Attachment
/sites/default/files/efs/forms/pc17/guidelines-for-permitting-new-antennas-and-replacement-of-units-on-existing-telecommunication-antennas-%28cell-towers%29.pdf

SS Program - Permitting and Inspection Process Guidelines

Submitted by fsepulveda on May 23, 2024
Effective field
Identifier
IB/P/BC 2023-136
Attachment
/sites/default/files/efs/forms/pc17/IB-P-BC-2023-136-SS-Permitting-and-Inspection-Process-2023.10.30.pdf

Alternative Design Procedure for Seismic Analysis and Design of Tall Buildings and Buildings Utilizing Complex Structural Systems

Submitted by fsepulveda on May 23, 2024
Effective field
Identifier
IB/P/BC 2023-123
Attachment
/sites/default/files/efs/forms/pc17/alternative-design-procedure-for-seismic-analysis-and-design-of-tall-buildings-and-buildings-utilizing-complex-structural-systems-ib-p-bc2017-123.pdf

Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure

Submitted by fsepulveda on May 23, 2024
Effective field
Identifier
IB/P/BC 2017-117
Attachment
/sites/default/files/efs/forms/pc17/structural-monitoring-equipment-in-buildings-designed-with-nonlinear-response-history-procedure-ib-p-bc2014-117.pdf
Subscribe to 2017