How long is a soils/geology report good for?
In general, four years, unless there is a change in the scope of work or adoption of a new LABC.
In general, four years, unless there is a change in the scope of work or adoption of a new LABC.
Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.
Check the “Search Online Building Records” on the Department’s web site. Previous soils/geology reports can also be obtained at the Records Section locations at 201 N. Figueroa Street, Rm. 110 (Metro) or 6262 Van Nuys Blvd., 2nd Floor (Van Nuys).
A grading permit may be required depending on the scope of the project. Permits are almost always required in the Hillside Grading Area. Please contact the Grading Division.
In general, infiltration is not allowed within a potentially liquefiable hazard zone. However, sites within a potentially liquefiable zone can be considered for infiltration if a soils report demonstrates that the site is not subject to liquefaction.
GPI waivers may be granted by the district grading inspector on a case by case basis. Waivers are generally not granted for deepened foundations, slopes 3:1 (H:V) or steeper, swimming pool, or retaining walls over 6 feet in height.
Yes. A completed GPI report may be obtained from the Records Section or Grading Division.
Not usually. However, further expediting supplemental reports for projects under construction can be considered. It’s recommended to discuss with the grading division reviewers at the time of submittal.