How long do I have to wait for a Demolition Pre-Inspection (DPI)?
A DPI normally takes two weeks minimum to be prepared.
A DPI normally takes two weeks minimum to be prepared.
It normally takes minimum of two weeks for a Sign Pre-Inspection (SPI) to be completed.
A Grading Pre-Inspection normally takes two weeks, but it could be longer.
A Plan Check is good for 18 months from the time the plan check fees are paid.
The Plan Check staff assigned to your project can explain the required fees for the plan check extension for your project.
The school fees for residential building and commercial buildings are different.
Please check with the office where you have submitted your Sign Pre-Inspection (SPI) application.
All new buildings, additions or remodeling which introduces new exterior openings need to comply with the current energy regulations.
A fence within the required front yard setback for a property is limited to 3.5 feet above the natural grade. The fence height within the required setbacks other than the front yard setbacks could be limited to 6 feet or 8 feet based on the location of the property. A fence in the Special Grading Area of the City is limited to 6 feet above the natural grade within the required side or the rear yard. Check the zoning for your property to see if it is located within the Special Grading Area.
Each permit extension is good for 6 months.