How do I know if the equipment is still approved?
Make sure that the equipment approval has not expired by checking the equipment approval letter. Each letter has an approval and expiration date that is indicated on the top right hand of the letter.
Make sure that the equipment approval has not expired by checking the equipment approval letter. Each letter has an approval and expiration date that is indicated on the top right hand of the letter.
No. Unless it is part of equipment approval by the LADBS-ETL with prior approval, provided that the testing is witnessed by the LADBS-ETL and the test program and equipment have already been approved by the LADBS-ETL.
Only products that have either a Laboratory or General Approval (no one-time approvals) may be subject to annual renewal. About 60 days before an approval expires, the original applicant needs to take the following actions:
The general and laboratory approval is good for 12 months. The product approval letter indicates the duration and expiration date of the approved product.
One-time approval is good for the duration where the equipment is installed, provided that the equipment is not modified or relocated to another location in or outside of the building or facility.
All equipment approved by LADBS-ETL, with some exceptions for some of the equipment that have General Approvals, are required to bear the approval label of LADBS-ETL. This approval label would be different from equipment that is approved under Laboratory or General Approval vs. Field one-time approval.
For equipment that has Laboratory Approval or General Approval, the applicant is required to submit the following:
Check the equipment approval letter. Every approval letter indicates the models that are included. You may check the approval letters on the "LA Research Reports" page.
An approved recognized electrical testing agency is a testing agency that obtains approval from the Department of Building and Safety to perform testing and listing and field evaluation. A list of these recognized testing agencies are posted on the LADBS web as follows on the "Electrical Test Lab (ETL)" page:
The steps are the same as regular approval, as follows:
Submit the following:
However, the revised approval may require a new model designation of the previous product and the approval would be for the duration that was originally established for the equipment.
There is one application form that is used for each type of submittal (New, Renewal, Technical and Clerical Modifications, for Laboratory, General, and One-time Approvals). You can obtain this form as follows:
Equipment manufacturer or equipment distributor (for general or one-time approval) and end user of the equipment (for one-time approval) can apply for equipment approval.