Skip to main content

What does "substantially the same location" mean? How much can my new home move within my lot?

The proposed building shall be located within a maximum offset of the existing building footprint. The allowable offset shall be a maximum of 20% of the lot width and 20% of the lot depth, in the same direction as the lot width or depth, respectively. The proposed building shall comply with all applicable yard setback requirements. However, for a building that was damaged or destroyed by the Wildfire and had a nonconforming yard, the new structure may be rebuilt or relocated within the nonconforming yard, provided the nonconforming yard is not further reduced.

Can RV’s, mobile homes and tiny homes be used as temporary housing during the reconstruction of my house?

Yes.  To assist homeowners in rebuilding after the 2025 wildfires and provide temporary living arrangements, under the Mayor's Emergency Executive Order No. 1, the placement of such structures on the property is allowed for up to three years, or while an active building permit is applicable to said property, whichever is longer.

Does Building and Safety recommend architects or engineers?

The Department does not recommend any architects or engineers. Prior to hiring an architect or engineer, we recommend that you review their licensing information.  For licensing information about architects, please visit the California Architects Board.  For licensing information about engineers, please visit the California State Department of Consumer Affairs

Subscribe to 2025 Wildfires