A soils report is needed for construction on a slope steeper than 3:1 (Horizontal:Vertical), excavations removing lateral support, when a structure cannot be designed per building code values, and/or for structures which do not conform to chapter 18 of the 2014 LABC. Reports are also required for sites in seismic hazard zones that are not exempt under Information Bulletin P/BC 2014-044.
Question label
When do I need a soils report?
Category
Mark as Popular
No