Filtered categories:
This type of parking is parking beneath the 2nd floor.
Was this helpful?
The acceptable pipe material for subsoil drain are listed in table 1102.5 of LAPC. Acceptable pipe material are Asbestos Cement, PE, PVC, and Clay.
Was this helpful?
A product (or equipment) is considered approved if it bears either the approval label of the City of Los Angeles Electrical Test Lab, or listing or certification label, symbol or other identifying mark of a recognized testing agency. In either case, the product (or the equipment) is installed and used according to any limitations or restrictions posed by the testing agencies and the requirements of the code. See section 93.0402 for more detail.
Was this helpful?
A Combined Building Permit (includes Electrical and Mechanical permits) can be issued for a single-family or a duplex; otherwise a separate Building, Electrical or Mechanical Permits is required.
Was this helpful?
You will receive an email from RTI.ladbs@lacity.org containing detailed instructions and links to enter contractor and/or owner information in order to pay the final permit fees online.
Was this helpful?
The documents required for submittal are:
For more details see our Plan Submittal for Regular Plan Check page.
Was this helpful?
The documents required for submittal are:
For more details see our Plan Submittal for Regular Plan Check page.
Plan Submittal for Regular Plan CheckWas this helpful?
HVAC Plumbing, Electrical, Fire Sprinkler, Green, Building, Public Works, Fire Department, Sanitation.
Was this helpful?
The permit will have a section named inspection checklist with all the required documents.
Was this helpful?