A modification is issued/processed by LADBS. A variance is handled by the Department of City Planning, when a project is not a by-right project.
Was this helpful?
According to Electrical Code article 100, an equipment or material that is tested by an approved testing agency meeting appropriate designated standards are considered as listed equipment, provided that also, the testing agency publishes a list of these products and the product bears the listing mark or logo of the testing agency.
Electrical equipment that is evaluated and tested by the City of Los Angeles Electrical Test Lab conforming to the requirement of the adopted standards and codes are considered as approved equipment.
Was this helpful?
General or laboratory approval is generally for identical mass produced equipment with a one-year approval time, after which a re-evaluation would be required for another one-year period, if the applicant would like to maintain approval.
One-Time approval is for field installed product(s) at a specific location. The approval for the product is limited to the location in which it's installed, but no annual renewal is required, as is the case of general approval.
Was this helpful?
A Title 24, Part 6 plan check is only for California state energy regulation compliance of indoor or outdoor lighting, desegregation and monitoring of electrical loads, and distribution equipment or service(s). The regular plan check involves building and premises wiring systems and may include Title 24, Part 6 energy regulation plan check.
Was this helpful?
The cost can range anywhere from 10¢ (cents) per page to $1.50 per page.
Was this helpful?
The cost is $137.80 for a TSE permit.
Was this helpful?
All plans and drawings need to be uploaded and submitted as single files in any of the following file formats/extensions: ADOBE, Vectored .PDF, .PDF
All plans and drawing files must be saved and uploaded in LANDSCAPE page layout.
Drawing should be true-type fronts.
The PDF files should have bookmarks based on sheet numbers for each sheet numbers for each sheet of the drawing set.
Properly formatted and compressed PDF files should not exceed 50 megabytes (50MB) per file.
A Plan Title (Cover) Page is require for each plan set.
A Sheet Index must be included on the Plan Title Page.
The upper right corner of ALL Plan and Title pages must be reserved for LADBS approval stamp (2.25” from the right edge, 0.25” from the top). See below sample for the Approval Stamp space and Sheet Index placement on the Title page.
Was this helpful?
LADBS offers a money-back guarantee on Express Permit times. If a walk-in customer waits longer than 30 minutes for service to begin, or if the customer waits longer than 60 minutes for the processing of the permit from the time that service begins, then the permit fee is waived.
Express PermitWas this helpful?
A point measured from the lowest adjacent grade to a point at the top of the building.
Was this helpful?